📦 Estimated lead times: In Stock 3–5 Days · Imported 5–8 Days · Locally Manufactured 10–15 Days · Delivery & installation on qualifying orders
Unpack and Check Parts Carefully remove all packaging and confirm that all components, bolts, washers, castors, gas lift, base, mechanism, armrests (if supplied), and the Allen key are included before starting.Â
Assemble the Base Push the castors firmly into the five-star base, then insert the gas lift into the centre of the base.
Attach the Mechanism Secure the seat mechanism to the underside of the seat using the supplied bolts. Tighten evenly without over-tightening.
Install Armrests and Backrest Attach the armrests (if included), then align and secure the backrest to the seat using the provided bolts.
Complete the Assembly Place the assembled seat onto the gas lift and press down firmly. Sit on the chair to lock the gas lift into position.
Final Safety Check Tighten all bolts, test the height adjustment, tilt mechanism, and castor movement before use. Little Lots Furniture also offers delivery and installation services for customers who require professional assembly